Practical lab · Power

Power budgeting

PoE classes against a switch budget, battery backup hours and a fire panel standby battery.

Simulation — not real hardware

Simulation — not real hardware. Results are planning estimates from the formulas shown; real equipment, cabling and firmware differ. Check datasheets and site conditions before you buy or install.

What this lab covers

Three power questions come up on every security job. Will the PoE switch power every camera — by the class each announces and by what it really draws? How long will a battery bank carry the load when mains fails? And how big must a fire alarm panel's standby batteries be?

Battery hours here are bank watt-hours × usable depth of discharge × converter efficiency ÷ load. Lead-acid capacity also falls in heat and with age, so leave margin. For fire alarm batteries use the method in the standard your project follows (for example IS 2189 or BS 5839-1) and the panel maker's calculation; the common method shown multiplies by an ageing factor of 1.25.

Worked example

Two 12 V 7 Ah batteries in series = 24 V 7 Ah = 168 Wh. At 80 % depth of discharge and 85 % efficiency, a 20 W load runs about 5.7 hours.

Fire panel: 0.25 A × 24 h standby + 1.5 A × 0.5 h alarm = 6.75 Ah; × 1.25 = 8.44 Ah, so the next standard size up.

Try it

1 · PoE switch budget
Ports
14 of 16
By class allocation
244.8 W of 250 W
By actual load
122 W of 250 W

Fits by class and by load.

2 · Battery backup time
Lead-acid: 50–80 %

5.7 h

Bank
24 V, 7 Ah = 168 Wh
Usable
114.2 Wh
3 · Fire alarm panel standby battery
Set by the standard and the site's mains backup
0.5 h is common

8.44 Ah

6.75 Ah × ageing factor 1.25. Choose the next battery size up and confirm with the panel maker's calculation.

Progress is kept only in this browser.All labsNext: Fire alarm fault-finding

Talk to an engineer

Not sure which service fits?

Tell us what you are working on. A Foxnet engineer will point you to the right session, book or request — or tell you honestly if you do not need one.